Selected Projects

A track record across sectors and geographies.

The projects below form part of Christos's professional experience gained while working for a number of engineering consultancies, where he was responsible for the geotechnical delivery of each commission. A representative sample — project photography follows below.

Building cross-section with boundary lines, London Boroughs Basement Impact Assessment
Basements · 2016 – present day

London Boroughs — Basement Impact Assessment

Technical auditor, peer reviewer and author of 60+ BIA reports for Camden, Kensington and Chelsea, Westminster and other London Boroughs, including finite element and qualitative ground movement analysis, and attendance, as required, at council planning meetings.

Predicted ground movement contours around Thames Water pipeline, Horn Lane
Residential / Commercial · 2025

Horn Lane, London – Utility Impact Assessment

Utility impact assessment for a Thames Water pipe in proximity to proposed piled foundations.

Slope stability analysis output showing factor of safety, Enderby
Slope Stability · 2025

Enderby, UK – Slope Stability Assessment

Peer review and sign-off of a preliminary slope stability assessment in accordance with Eurocode 7, supporting planning and design for a commercial scheme that included cut slopes adjacent to the M1 Motorway.

3D ground movement analysis model for Peckham Road, London
Commercial · 2024–2025

Peckham Road, London – Ground Investigation, Geotechnical Assessment & BIA

Ground investigation and assessment services for a new seven-storey commercial building including a two-storey basement, with a basement impact assessment undertaken to support planning in an area with several buildings and utilities in proximity to the site.

Embankment widening typical benching detail drawing, Crewe highway embankment
Highways · 2023–2024

Crewe, UK – Highway Embankment

Designer's Geotechnical Advisor for a roundabout, access road and embankment to CD 622 'Managing Geotechnical Risk' requirements of the National Highways.

Foundation pit inspection in Chalk showing dissolution feature, High Wycombe
Commercial / Industrial · 2023

High Wycombe, UK – Foundation Pits Inspections

Foundation inspections in Chalk where dissolution features were present. Provided foundation recommendations to mitigate dissolution features risk.

Historic geological mining plan used for coal mining risk assessment, Llantrisant
Commercial / Industrial · 2022

Llantrisant, Wales – Coal Mining Risk Assessment

Desktop coal mining risk assessment for a new commercial development.

3D massing model of the Wembley 25-storey mixed-use development Undrained shear strength profile with proposed design line, Wembley
Residential / Commercial · 2019

Wembley, London – 25-Storey Mixed-Use Development

Design, specification, procurement and supervision of ground investigation for a two-storey basement and multilevel up to 25-storey tower, including pile bearing capacities for tender design.

Tunnel excavation face with support rig, High-Speed Railway Greece Viaduct piers under construction, High-Speed Railway Greece
Infrastructure · 2002–2011

High-Speed Railway, Greece

Responsible for the procurement, supervision, and design check of geological and geotechnical design reports for tunnels, bridges, embankments, cut slopes, intended for construction.

Votonosi Tunnel portals on the Egnatia Motorway, Metsovo, Greece
Tunnels · 1997–2000

Egnatia Motorway, Greece — Anthochori & Votonosi Tunnels

Responsible for the final design of the tunnel portals, as well as for the geotechnical assessment of the main tunnel.